EVChargeTime

Mercedes-Benz EQA charging time on a 350 kW DC ultra-fast

Effective charging power: 100 kW (DC).

≈ 28 min

That is an estimate for a 10–80% charge of the Mercedes-Benz EQA’s 66 kWh usable battery on a 350 kW DC ultra-fast.

⚡ The Mercedes-Benz EQA peaks at 100 kW on DC, so it cannot use the full 350 kW of this charger — it charges at up to 100 kW.

Mercedes-Benz EQA on 350 kW DC — charge times

ChargeTime
0–100% (full)40 min
20–80% (daily)24 min
10–80% (road trip)28 min
Add 100 miles of range15 min

DC rapid charging slows down significantly above 80% to protect the battery, so the 10–80% figure is the one that matters on a road trip — charging to 100% on DC is rarely worth the wait.

Shop 350 kW DC chargers & cables on Amazon →

Same car, other chargers

ChargerEffective10–80%
2.3 kW plug2.3 kW28 h 42 min
7 kW wallbox7.4 kW8 h 55 min
11 kW wallbox11 kW6 h
22 kW AC11 kW6 h
50 kW DC50 kW55 min
150 kW DC100 kW28 min

FAQ

How long does it take to charge a Mercedes-Benz EQA on a 350 kW DC ultra-fast?
Roughly 28 min for a 10–80% charge, at an effective 100 kW. A full 0–100% takes about 40 min.
Can the Mercedes-Benz EQA use the full 350 kW?
The Mercedes-Benz EQA peaks at 100 kW on DC, so it cannot use the full 350 kW of this charger — it charges at up to 100 kW.
What is the fastest way to charge the Mercedes-Benz EQA?
Its peak DC rate is 100 kW and its onboard AC charger is 11 kW. A 50 kW DC charger gives the quickest top-up; home AC is best done overnight.